I love a good mystery. Always have, going back to when I was a kid & couldn't get enough of Nancy Drew, and now with a good John Grisham thriller. Combine my love of mysteries with quilting? Heaven! But I don't trust just anybody with a mystery quilt. Bonnie Hunter runs a free mystery every fall through her blog (Easy Street tab at the top, or others under Mystery Quilts tab), and I've never been disappointed with how they come out. How can I resist?
We got home Sunday afternoon from a wonderful Thanksgiving with my side of the family. I printed out the Easy Street part 1 directions from my Mom & Dad's house. My fabrics weren't pulled yet, but I had bought a fun hot pink "constant" and washed it, and decided that my other colors would be the same as Bonnie's. I started last year's mystery, Orca Bay, over the summer as leaders & enders. I'm using white on black for the background there, and since I can't seem to stop collecting them I knew I'd have plenty for this mystery, too.
The first thing I needed to do with my sewing time (which started within an hour of getting back in town - could have been shorter if I hadn't needed to make a quick grocery run!) was add the borders to my Minglewood BOM shop sample. It's a big quilt, so that took a while. I can't get it all in one pic from home, so here's a preview:
I'll take another pic once it's displayed at the shop. I'm so excited the top is done! Eula at the shop is going to quilt it for me. I think it deserves fancy custom quilting and I just don't feel like doing that much these days. Metallic thread is also something it might need, and my machine and I haven't had any luck with that in the past. So it will hang at the shop as a top until my turn comes up with Eula.
But back to the mystery! My reward for finishing the Minglewood top was starting Easy Street and spending some dedicated time on Orca Bay step 1.
These are my fabs, now pulled and ready! Everything is stash except the hot pink constant.
Now that I see it in the pic, I think the top lime green isn't hot enough, so it might get the boot. But it has purple and turquoise in it, so I'll keep it out for now just in case it will work when I see how it's used.
No finished 4-p's (four-patches) from step 1 to show yet, but I have over half of the strip sets sewn.
After I took this pic I pressed the strips and now they're ready to sub-cut.
And Orca Bay is progressing!
This is 142 qst's (quarter-square triangles). 82 more to go, and I have a bunch cut and some pairs sewn toward that end.
Finally, while I haven't been faithful to an hour a day of "Sewing with Bonnie" handwork, I haven't abandoned my Vintage Tin embroidery either. Here's the current block. The BOM has now started at the shop so I need to get back at it if I want to stay ahead of the BOM participants!
If you look closely at the pic below, you can see that I've got about half of this block done.
Are you keeping up with an hour a day of hand sewing? How about Easy Street? Are you jumping on the bus to Easy Street? See the other blog posts of participants linking up with Bonnie here.
Thanks for stopping by!
Nan
Monday, November 26, 2012
Friday, October 26, 2012
Christmas in October
I have a finish! I'm not sure there's a better feeling in quilting than finishing. Except of course, starting. Which explains why I have so many UnFinished Objects! ;) This is a UFO from last fall. I didn't get it done in time for last Christmas, so it fell to the back burner. It traveled with me to a few retreats, but had gradually made its way to the bottom of my "retreat bag".
This week I decided that I wanted to finish it. When I pulled it out it wasn't as far along as I remembered. :( But I spent my sewing time this week working on it and finished it Thursday night. Bonnie's quilt cam coincided with the last of the machine applique (which I did through all three layers, so it would double as quilting) and the embellishment. It's fun to sew along with her and other quiltville.com fans.
Here's the project, from Jingle All the Way by Nancy Halvorsen. This is after machine applique, before embellishment.
The pattern called for lots of jingle bells that I didn't have. I also didn't have the right color green buttons for the hanging tabs at the top. At first I thought I'd buy what I needed tomorrow. Drat, I really wanted to finish this up! So I scrounged around my junk, err, I mean "notions" shelf, and came up with these things:
The scallop border at the bottom was supposed to have five large red jingle bells, one for each scallop. Guess how many cute little bells are in that bag on the left?!? Five! :) Since I'm in the bell choir at church, I decided it would be perfect, and my song could be rung, not sung! I used one of the tiny jingle bells for Santa's hat, and found almost all the buttons I'd need in the middle package. A little more scrounging around for another holly berry looking button, and I was good to go!
All done!
Finally, here's a close-up of my favorite part.
Thanks for stopping by,
Nan
This week I decided that I wanted to finish it. When I pulled it out it wasn't as far along as I remembered. :( But I spent my sewing time this week working on it and finished it Thursday night. Bonnie's quilt cam coincided with the last of the machine applique (which I did through all three layers, so it would double as quilting) and the embellishment. It's fun to sew along with her and other quiltville.com fans.
Here's the project, from Jingle All the Way by Nancy Halvorsen. This is after machine applique, before embellishment.
The pattern called for lots of jingle bells that I didn't have. I also didn't have the right color green buttons for the hanging tabs at the top. At first I thought I'd buy what I needed tomorrow. Drat, I really wanted to finish this up! So I scrounged around my junk, err, I mean "notions" shelf, and came up with these things:
The scallop border at the bottom was supposed to have five large red jingle bells, one for each scallop. Guess how many cute little bells are in that bag on the left?!? Five! :) Since I'm in the bell choir at church, I decided it would be perfect, and my song could be rung, not sung! I used one of the tiny jingle bells for Santa's hat, and found almost all the buttons I'd need in the middle package. A little more scrounging around for another holly berry looking button, and I was good to go!
All done!
Finally, here's a close-up of my favorite part.
Thanks for stopping by,
Nan
Some show & tell...
I've been busy sewing, and have some pics to share with y'all.
Most exciting is the progress made on my Minglewood BOM. All the kits for the shop are now cut! Here are 2/3 of the blocks put together!
I have four more blocks made, and four others cut and ready to sew.
Last week I got the binding tacked down on this cuddle quilt shop sample that I showed you recently:
A couple weeks ago I got this quilt top done. It's only fused now, but I'll machine applique through all three layers. I think it's so stinkin' cute! It's also a shop sample. (Notice a theme? lol)
It's called Baby Bunny's Bedtime and is from a really great book called Story Time by Kim Diehl. All the quilt designs tell a story for you to talk about with the child. What's your favorite thing that Bunny is doing to get ready for bed? I love the potty block! :) The machine applique will be done after I quilt it, and the embellishment for the faces will be last.
Finally, I finished the Vintage Tin embroidery block I was working on a few weeks ago and have started the next one. Here's the finished one:
Thanks for stopping by!
Nan
Most exciting is the progress made on my Minglewood BOM. All the kits for the shop are now cut! Here are 2/3 of the blocks put together!
I have four more blocks made, and four others cut and ready to sew.
Last week I got the binding tacked down on this cuddle quilt shop sample that I showed you recently:
A couple weeks ago I got this quilt top done. It's only fused now, but I'll machine applique through all three layers. I think it's so stinkin' cute! It's also a shop sample. (Notice a theme? lol)
It's called Baby Bunny's Bedtime and is from a really great book called Story Time by Kim Diehl. All the quilt designs tell a story for you to talk about with the child. What's your favorite thing that Bunny is doing to get ready for bed? I love the potty block! :) The machine applique will be done after I quilt it, and the embellishment for the faces will be last.
Finally, I finished the Vintage Tin embroidery block I was working on a few weeks ago and have started the next one. Here's the finished one:
Thanks for stopping by!
Nan
Tuesday, October 23, 2012
Still here!
Things have been so busy since we got home from vacation! And yes...I still promise to finish posting about vacation by telling you about Charleston, and one other stop we made. Life has just rushed past and I haven't gotten to it yet. Whenever I have a little free time, I've wanted to sew instead of sit at the computer. A post about that will be coming soon, too.
I had decided that even though our vacation wasn't until late September, it would be warm enough that I could still hold on to summer until after vacation. And the weather was so beautiful in GA & SC that my plan worked out great. Of course that meant that by the time we got back home, it was soon October and fall was in full swing.
This is a beautiful flaming red maple tree in our backyard, shortly after we got home.
And after some heavy rain and wind, here is the tree today. :(
Time flies...trite, but true. It's still fall, and we're enjoying lots of fun fall activities like football, as well as a wonderful visit from my parents. But before we know it, all the hardwoods will be bare like this one. But this pic is deceiving. Today it's 80 degrees! A little taste of summer is back. It will be winter all too soon, so I'm cherishing this unusually warm week in Oct!
Pics of my sewing progress and the rest of the vacation pics, soon.
Thanks for stopping by,
Nan
I had decided that even though our vacation wasn't until late September, it would be warm enough that I could still hold on to summer until after vacation. And the weather was so beautiful in GA & SC that my plan worked out great. Of course that meant that by the time we got back home, it was soon October and fall was in full swing.
This is a beautiful flaming red maple tree in our backyard, shortly after we got home.
And after some heavy rain and wind, here is the tree today. :(
Time flies...trite, but true. It's still fall, and we're enjoying lots of fun fall activities like football, as well as a wonderful visit from my parents. But before we know it, all the hardwoods will be bare like this one. But this pic is deceiving. Today it's 80 degrees! A little taste of summer is back. It will be winter all too soon, so I'm cherishing this unusually warm week in Oct!
Pics of my sewing progress and the rest of the vacation pics, soon.
Thanks for stopping by,
Nan
Monday, October 1, 2012
Sewing with Bonnie, update
I can't really call this post a "progress report". lol This is where I was two weeks ago. Since then I got the next two cut blocks prepared with interfacing and traced. Both blocks are now well traveled, having gone with me on vacation, but I'm afraid I didn't get any embroidery done until yesterday on the way home. I decided to just enjoy the vacation and not worry about it. The official commitment was for the month of Sept, but I'm going to keep going and I can make up for lost time this week. :)
So here's the stitching that I got done just before the trip and on the way home yesterday:
This is one of the license plate blocks for Vintage Tin. Eula at the shop drew a customized KS license plate to replace one of the license plates in the pattern.
How are you doing with one hour a day of hand work or other relaxing "me time"? To check the progress of others sewing along with Bonnie, check here.
Thanks for stopping by,
Nan
So here's the stitching that I got done just before the trip and on the way home yesterday:
This is one of the license plate blocks for Vintage Tin. Eula at the shop drew a customized KS license plate to replace one of the license plates in the pattern.
How are you doing with one hour a day of hand work or other relaxing "me time"? To check the progress of others sewing along with Bonnie, check here.
Thanks for stopping by,
Nan
Sunday, September 30, 2012
Oh, boy! Vacation!
Mark and I got home this afternoon after a wonderful vacation! As great a time as we had, it feels good to be back home. If you'd like to see some vacation pics, keep reading. :)
The first stop on our trip was Savannah, GA. What a beautiful city. There's so much history there, and all the restored historic houses, plus beautiful squares that are like mini-parks spread all throughout the historic district make Savannah special. There are also lots of old, old live oaks with spanish moss hanging off the branches. City leaders negotiated with Sherman to turn over the city without any gunfire in exchange for him not burning the town on his march to the sea, so many historic buildings remain.
Here's the oldest and therefore biggest live oak we saw:
The building in the back was a hospital during the Civil War. According to a tour guide, the confederate soldiers were hospitalized here. Union soldiers were "patched up" then put outside under this tree to recuperate. The circumference of this tree is 16 feet!
Forsyth Park is so beautiful. Here's a fountain in the park.
This is St. John's Episcopal Church. We saw it one night while walking but didn't get to go inside. Gen Sherman spent Christmas here in 1863. He was in Savannah that winter.
This is The Catherdral of St. John the Baptist. (Not to be confused with the Episcopal church above!)


These pics are from the graveyard at Colonial Park Cemetery. The marker above says, "Here lyeth the body of Theodora Ash who passed this life February 17th, 1770 aged 17 years" I think the detail work of the flowers on the sides and scrollwork at the top are beautiful. I couldn't read all of the bottom, but it starts out, "If innocence and virtue..."
The marker below says, "..?.daughter of William & Rebecca Pinder died July ? 1794..?."
This is the Mercer-Williams house, where much of "Midnight in the Garden of Good & Evil" was filmed. Mark took this pic from across the street in Monterey Square. We took a tour of the house and saw the study where Jim Williams killed Danny Hansford. Some of Jim's family still lives in the top floor of the house and the first floor where we were remains much the same as it was when Jim died.
This may look like a mild mannered park, or even a parking lot. But it's the Dueling Grounds where adversaries would stand back to back, walk 12 paces, then turn and shoot! Yikes! I guess that would be "winner take all" competition to the extreme.
The squares in Savannah are so beautiful. There are 21 in all. We ran across 3 different weddings over the weekend while we were there. This bride arrived at the ceremony in a pedal taxi!
We spotted the Independent Presbyterian Church while walking, and decided to worship there on Sunday morning. I admit, I can be a tacky tourist. Here's the inside which I shamelessly snapped pics of before the service started. At least I turned off the flash! lol
This is just a cute gutter ornament that I couldn't resist.
One of the last things we got to do was have lunch with a friend of mine from high school. What fun to catch up with her!
Mark & I are eager to go back to Savannah some time. We feel like we barely scratched the surface of this fantastic city. Have you ever been there? What were your favorite sites?
Next stop, Charleston...stay tuned!
Thanks for stopping by,
Nan
The first stop on our trip was Savannah, GA. What a beautiful city. There's so much history there, and all the restored historic houses, plus beautiful squares that are like mini-parks spread all throughout the historic district make Savannah special. There are also lots of old, old live oaks with spanish moss hanging off the branches. City leaders negotiated with Sherman to turn over the city without any gunfire in exchange for him not burning the town on his march to the sea, so many historic buildings remain.
Here's the oldest and therefore biggest live oak we saw:
Forsyth Park is so beautiful. Here's a fountain in the park.
This is St. John's Episcopal Church. We saw it one night while walking but didn't get to go inside. Gen Sherman spent Christmas here in 1863. He was in Savannah that winter.
This is The Catherdral of St. John the Baptist. (Not to be confused with the Episcopal church above!)


These pics are from the graveyard at Colonial Park Cemetery. The marker above says, "Here lyeth the body of Theodora Ash who passed this life February 17th, 1770 aged 17 years" I think the detail work of the flowers on the sides and scrollwork at the top are beautiful. I couldn't read all of the bottom, but it starts out, "If innocence and virtue..."
The marker below says, "..?.daughter of William & Rebecca Pinder died July ? 1794..?."
I was struck by how many of the gravestones were for people who died before the age of 30. Most of them were only children. There were also many graves of people who died from the yellow fever epidemic in the early 1820's.
One morning we had a delicious brunch at Clary's, made famous by the book & movie, "Midnight in the Garden of Good & Evil". We watched it again just before we left, and I found the book at the library and read it on the trip. Here's Mark posing with his breakfast. :)
This may look like a mild mannered park, or even a parking lot. But it's the Dueling Grounds where adversaries would stand back to back, walk 12 paces, then turn and shoot! Yikes! I guess that would be "winner take all" competition to the extreme.
The squares in Savannah are so beautiful. There are 21 in all. We ran across 3 different weddings over the weekend while we were there. This bride arrived at the ceremony in a pedal taxi!
We spotted the Independent Presbyterian Church while walking, and decided to worship there on Sunday morning. I admit, I can be a tacky tourist. Here's the inside which I shamelessly snapped pics of before the service started. At least I turned off the flash! lol
This is just a cute gutter ornament that I couldn't resist.
One of the last things we got to do was have lunch with a friend of mine from high school. What fun to catch up with her!
Mark & I are eager to go back to Savannah some time. We feel like we barely scratched the surface of this fantastic city. Have you ever been there? What were your favorite sites?
Next stop, Charleston...stay tuned!
Thanks for stopping by,
Nan
Monday, September 17, 2012
Sewing with Bonnie, more progress
After not feeling well at the beginning of the week, I made up for lost time the rest of the week and ended up with 10 hours of hand work on my Vintage Tin embroidery block.
And it's finished! You can see where the block was when I started the week here. I have two more blocks cut and ready to trace.
How are you doing with your one hour of hand work a day?
Thanks for stopping by and I hope your week is off to a great start,
Nan
And it's finished! You can see where the block was when I started the week here. I have two more blocks cut and ready to trace.
I also spent some time piecing this weekend. Remember this pile of fabric? Now it's not only a finished quilt top, but it's also quilted! I even got the binding sewn on and ready to hand tack. :)
I couldn't get the whole thing in my pic, but you can get the idea. This will be a sample at the shop. It's made out of fun Christmas flannels and minkee. So soft and cuddly!How are you doing with your one hour of hand work a day?
Thanks for stopping by and I hope your week is off to a great start,
Nan
Subscribe to:
Posts (Atom)



































